We are already seeing a return on our investment in reduced CAD/engineering time

I used the 30 day download to produce a mini DriveWorks project that produces CAD data and drawings for the stainless steel baskets we sell as accessories for our ultrasonic cleaning equipment.
After spending about a week on and off playing with the tutorials and learning, it took me 3 days to complete the DriveWorks project and now we can generate a detailed CAD basket assembly in seconds along with the drawings to go with them.
The experimental DriveWorks project was then used to support a cost benefit analysis. Airing on the side of caution we will be saving at least 5 days engineering time per project we complete.
I was able to demonstrate that the investment in the software and time needed to fully implement the projects could be ammortised within 6 months and my directors did not hesitate in agreeing to place an order..
This feedback was received from Paul Chapman of Ultrawave.
